News from Hestora
Progress on prototypes, home trials, and our journey to bring zero-emission heating to the homes we already live in.
-
Engineering the future of home heating
Development · June 2026 — Inside the Hestora thermal energy store prototypes: precision engineering, rigorous testing, and the UK home trials that prove a direct swap from gas works.
-
Engineering a direct swap
Designed for purpose · June 2026 — How Hestora matches a gas boiler's output with high-temperature, high-pressure design — a full day of heat, stored overnight, in a boiler-sized footprint.
-
A data-driven approach to Net Zero
Mission · May 2026 — Domestic heating causes 21% of UK emissions. Why 28 million existing homes need a heating solution that works without a deep retrofit.
Be first in the queue
A monitored pilot of more than 20 homes begins in November 2026, with commercial sales planned for 2027.
Register interest Resources & downloads